• HOME
  • PRODUCTS
  • FAQ
  • GALLERY
  • CONTACT
  • DOWNLOAD
  • Ever Green Trellis-Ever Green Trellis

    Ever Green Trellis
    Ever Green Trellis


    Ever Green TrellisTM

    The Ever green system consists in using a swing bolt, which will allow to adjust the clearance between the vine and the wall using different length of the swing bolt and a 2” backing washer for support, plus the swage stud with cable.



    EYE BOLT

    ITEM

    A

    B

    L

    444S-A-1080

    3/8”-16

    2”

    3-1/4”

    444S-A-10100

    3/8”-16

    3-3/16”

    4”

    444S-A-10120

    3/8”-16

    4”

    4-3/4”


    BACKING WASHER

    ITEM

    A

    B

    L

    30735S-10

    3/8”-16

    1/4”

    2”


    DROP IN ANCHOR

    ITEM

    A

    B

    L

    445S-08

    5/16”

    0.38”

    1.50”

    445S-10

    3/8”-16

    0.50”

    1.50”


    HAND SWAGE STUD

    ITEM

    A (CABLE)

    B

    L

    7801S-HS-0603

    1/8”

    1/4”-20 x 1-7/8”

    3-3/4”

    7801S-HS-0605

    3/16”

    1/4”-20 x 1-7/8”

    4-1/4”

     
    CROSS CABLE CLIP

    ITEM

    A (Wire)

    B

    L

    263S-03

    1/8”

    3/4”

    7/8”

    263S-05

    3/16’

    3/4”

    7/8”

    263S-06

    1/4”

    3/4”

    1”


    The following are some of the patterns for trellis ideas:

         


    How to design a Ever Green TrellisTM?

    - Determine your trellis area, which can be a rectangular Diamond shape ( see illustration 1-2 and 1-3) and choose the swing bolt or stand-off for your system.

    - Drill ½” hole every 1’-2’ distance (depending on type of vine) on the top and bottom and left and right of your trellis area.

    - Place the 3/8” drop in anchor into each hole.

    - Put the socket screw inside the stand-off and screw on to the wall or screw in the swing bolt if you chose the Ever Green Trellis System.

    - Place each end of the cable assemblies into the swing bolt or stand-off on each side of the trellis. ( Note: cable assembly can be provided by QMH or Hand Swage fittings are available to assemble at site)

    - Tighten the nuts on both ends to tension the cable. ( Just enough to hold the vine)

    - Place  the cross cable clip on the intersection where the cable need extra support of the vine. 

    Optional: Trim the excess threaded stud and use a round cap or cap nut to finish.

     



     


     

  • System message
  • Yes
  • System message
  • Yes No